icon Built for Telecom Tower Power Metering

  • Shared Telecom Towers
    Measure energy consumption separately for multiple telecom operators sharing one site.
  • AC Distribution
    Monitor utility/generator input, SMPS AC input, air conditioners, lighting and auxiliary loads.
  • -48V DC Distribution
    Measure SMPS output and individual DC branches supplying telecom equipment.
  • Remote Tower Sites
    Collect and transmit meter data through RS485, 4G or other supported communication methods.

icon Why Telecom Towers Need More Than a Single Energy Meter?

Pain

01. One Tower, Multiple Operators

A shared telecom tower may serve multiple operators, but a single total energy meter cannot show how much energy each operator actually consumes.

02. AC and DC Loads Need Different Metering

AC input, air conditioners and lighting are typically measured separately from -48V DC telecom loads. Using different standalone meters can increase wiring, cabinet space and installation complexity.

03. Remote Towers Are Difficult to Inspect

Manual meter reading and on-site troubleshooting across hundreds or thousands of distributed tower sites increase operating costs and delay fault response.

04. Too Many Meters Increase Project Cost

Conventional single-loop meters require one meter per circuit, increasing device quantity, wiring and cabinet space.

Value

Operator-Level Energy Allocation

Acrel multi-circuit AC/DC metering provides independent measurement for each operator, creating transparent and auditable energy data for cost allocation and billing.

Complete AC/DC Power Visibility

Acrel combines AC and DC multi-circuit metering options to cover the complete tower power path—from incoming power and SMPS input to DC telecom branches.

Remote Monitoring & Faster O&M

With RS485 and 4G communication options, energy data can be collected remotely for centralized monitoring, reporting and abnormal-consumption analysis.

High-Density Multi-Circuit Measurement

Multi-circuit meters measure multiple AC or DC circuits in one device, reducing the number of meters and simplifying installation.

icon Which Telecom Tower Metering Configuration Do You Need?

Your ApplicationRecommended MeteringTypical Loads
AC DistributionAC Multi-Circuit MeterUtility, generator, SMPS AC input, HVAC, lighting
-48V DC DistributionDC Multi-Circuit MeterSMPS output, telecom equipment, operator branches
Shared TowerAC/DC Multi-Circuit MeteringPer-operator energy allocation
High-Density TowerHigh-Density Multi-Circuit MeterMultiple AC/DC branches
Remote Tower4G / RS485 MeteringCentralized remote monitoring

icon Choose the Right Meter for Your Telecom Tower

AC Multi-Circuit Meter

DTSD1352-4S

For monitoring utility/generator input, SMPS AC input, air conditioners, lighting and other AC loads.

Up to 4 × 3-phase / 12 × 1-phase circuits

  • RS485 / Modbus-RTU
  • Modbus-TCP Ethernet
  • AC/DC 85–265V or DC 9–60V
  • DIN-rail installation
  • CT / Rogowski coil options

Best for: AC distribution cabinets and multi-load tower sites.

4x3Ph
12x1Ph

RJ12 CT
Rogowski coil

Modbus-RTU RS485
Modbus-TCP Ethernet

Power Supply:
AC/DC85-265V, DC9-60V

6DI 1DO
2DI 2DO

AMC16L DETT+Hall Sensor 20260813164638

02. DC Multi-Circuit Meter

AMC16(L)-DETT

Designed for -48V DC telecom power distribution and multi-operator energy allocation.

6 independent DC circuits

  • Reserved circuit
  • Total DC consumption
  • Operator A
  • Operator B
  • Operator C
  • Reserved circuit

Best for: Measure Each Operator’s DC Energy Separately

6 DC Loops

Hall Sensor Ready

Modbus-RTU RS485

Power Supply: DC-48~-60V

DI 4-20mA

LCD or w/o LCD display

03. High-Density AC/DC Metering

AMC200 (AC) & AMC200 (DC)

For telecom towers with a large number of AC or DC circuits.

Multi Circuits:

  • AC: up to 24 single-phase / 8 three-phase circuits
  • DC: up to 12 circuits

Best for: One meter. Multiple circuits. Less wiring. Less cabinet space.

AC 24/8 or DC 12 Loops

RJ12 Current Sensor / Hall Sensor

4G/NB-IoT/RS485

Power Supply: AC/DC85-265V

4DI

LCD or w/o LCD display

Low Voltage Distribution Box

04. Low Voltage Distribution Box

ANDPF Series

monitor multiple incoming and outgoing circuits, providing visibility into power consumption across rectifiers, batteries, air conditioning, lighting, and telecom equipment.

Best for:

  • AC & DC Power Distribution Monitoring
  • Multi-Circuit Energy Metering
  • Shared Telecom Tower Energy Allocation
  • Remote Power Monitoring & O&M

AC Monitoring

DC Monitoring

Circuit Metering

Energy Allocation

Remote Monitoring

icon Tower Architecture

From Power Measurement to Multi-Operator Billing

From AC input to -48V DC telecom loads, Acrel provides end-to-end energy metering for shared and remote telecom towers.

From Power Measurement to Multi Operator Billing

icon Multi-Operator Billing

Turn Tower Energy Data Into Transparent Operator Billing

Without Multi-Operator MeteringWith Acrel Multi-Circuit Metering
Total tower consumption onlyOperator-level measurement
No operator-level dataAccurate energy data
Manual allocationAutomatic data collection
Billing disputesTransparent allocation
Revenue leakageMore reliable billing

Measure → Allocate → Report → Bill

icon Technical Fit

Designed for Telecom Tower Integration

  • AC & DC Compatibility
    Support AC distribution and -48V DC telecom power monitoring.
  • Multi-Circuit Measurement
    Measure multiple circuits with one compact device, reducing cabinet space and wiring.
  • Communication
    RS485 / Modbus-RTU and selected 4G / Ethernet / Modbus-TCP options for remote data transmission.
  • Remote Monitoring
    Connect field meters to a gateway or energy management platform for centralized monitoring.
  • Sensor Compatibility
    CT, Rogowski coil and Hall sensor options are available for different AC/DC measurement requirements.
  • Retrofit-Friendly
    Compact DIN-rail and multi-circuit designs help simplify installation in existing telecom power cabinets.

icon Why Choose Acrel for Telecom Tower Metering?

  1. AC + DC in One Solution
    Measure both AC distribution and -48V DC telecom loads.
  2. Multi-Operator Ready
    Designed for shared tower energy allocation and transparent billing.
  3. High-Density Metering
    One device can replace multiple single-loop meters.
  4. Remote Communication
    RS485, 4G and other communication options for distributed tower sites.
  5. Technical Selection Support
    Send us your tower configuration and we can recommend the suitable meter, CT/Hall sensor and communication method.
  6. Global Project Experience
    Acrel solutions cover telecom, data centers, utilities, industrial and infrastructure applications.

icon Case Study @ TASC Tower

icon 1 Telecom Tower Power Monitoring Project in Dubai, UAE

Acrel delivered an AC/DC energy metering solution for a telecom tower project in Dubai, supporting intelligent power monitoring for a shared telecom site. The customer, TASC Towers, required real-time visibility of both AC and DC power distribution to improve energy management and ensure reliable operation of critical telecom equipment.

The solution integrates Acrel DTSD1352-4S multi-circuit AC energy meters, AMC16L-DETT DC energy meters, and AKH-0.66/K split-core current transformers to monitor utility power, rectifiers, batteries, air conditioners, and other key loads. Energy data is transmitted to the management platform through standard communication protocols, enabling centralized monitoring and remote operation.

Project Highlights

  • Location: Dubai, UAE
  • Customer: TASC Towers
  • Application: Telecom Tower Power Monitoring
  • Products: DTSD1352-4S, AMC16L-DETT, AKH-0.66/K Split-Core CT

Project Benefits

  • Real-time monitoring of both AC and DC power systems
  • Multi-circuit energy measurement for telecom distribution cabinets
  • Remote data collection and centralized energy management
  • Reduced maintenance workload and improved operational efficiency
  • Scalable solution for future telecom tower deployments
TASC TOWER
TASC TOWER project onsite photo2
TASC TOWER project onsite photo1

icon FAQ

Can Acrel meters measure both AC and DC power in telecom towers?

Yes. Acrel provides dedicated AC and DC multi-circuit meters for telecom tower power distribution.

Can the meter measure energy consumption for different telecom operators?

Yes. Multi-circuit DC metering can independently measure operator-specific branches, supporting transparent energy allocation and billing.

How many circuits can one meter monitor?

It depends on the model. DTSD1352-4S supports up to 12 single-phase or 4 three-phase AC circuits, while AMC16(L)-DETT provides 6 DC metering circuits. High-density AMC200 models support more circuits.

Can the meters communicate with a remote monitoring platform?

Yes. Depending on the selected model, communication options include RS485/Modbus-RTU, 4G and Ethernet/Modbus-TCP.

Can you recommend a meter based on our tower configuration?

Yes. Send us the number of AC/DC circuits, voltage, current range, operator count and communication requirements. Acrel engineers can recommend the suitable meter and sensor configuration.

Do you support telecom tower retrofit projects?

Yes. Compact multi-circuit and DIN-rail designs can be used for new installations and retrofit projects.

icon Not Sure Which Telecom Tower Meter You Need?

Send us your tower configuration. We will help you select the suitable AC/DC meter, number of circuits, sensors and communication method.

Get a Free Metering Recommendation

Contact Us

We’d love to hear from you!

Have a project in mind? Let’s make it happen.

Customer Testimonials

What Our Clients Say

PD Monitoring

We’ve used Acrel products on several projects, and they’ve been reliable from day one. Installation was straightforward, and the support team was always quick to answer our questions.

Saudi Arabia

Mohamed Elshazly

–

Tendering Director

Power Monitoring Solution

We were looking for a cost-effective metering solution, and Acrel was a great fit. The products work well, communication is stable, and delivery was on schedule.

United Arab Emirates

Asad Janjua

–

Electrical Engineer

Temperature Monitoring

The wireless temperature monitoring system has been running smoothly since commissioning. It helps us identify potential issues early and reduces the need for routine inspections.

Saudi Arabia

Abbas Matar

–

Project Manager

Long-Term Partnership

We’ve been working with Acrel for several years now. The products are dependable, reasonably priced, and the overall experience has always been positive.

Philippines

Arnold Bagabaldo

–

CEO

Technical Support

What we appreciated most was the technical support. The Acrel team helped us choose the right products and stayed involved until the project was completed.

Canada

David Dudley

–

System Integration Manager

SCADA Integration

The products integrated easily with our existing SCADA platform. Everything worked as expected, and commissioning was completed without any major issues.

Russia

Alexey Petrov

–

Sales manager